You don't have javascript enabled. Good luck with that.
Pencarian
85 Saluran Air Dibangun di Jaktim
....
photo Nurito - Beritajakarta.id

85 New Channels Built in East Jakarta During 2023

Some 85 new water channels have been built in several areas spread across East Jakarta during 2023 after passing through the e-catalog system phase.

It was built in stages from March 8 to December 15

East Jakarta Drainage Development and Improvement Sector Head, Tengku Saugi Zikri said the water channel construction in 85 locations was divided into seven stages. For stages one to three, there were 12 channels each.

Then stage four has 14 channels, stage five has 17 channels, stage six has eight channels, and stage seven has 10 channels.

Channels in Puspa Indah RPTRA Cleaned from Garbage

"It is a follow-up to the residents' proposal through Musrenbang, to overcome the problem of inundation during the rainy season," he expressed, Thursday (4/1).

According to him, the construction used U-Ditch concrete and box culverts with varying sizes, ranging from 40 to 150 centimeters, depending on the conditions in the field.

"It was built in stages from March 8 to December 15," he expressed.

Those channels were located on Jalan Giri Kencana RW 02 Cilangkap along 669 meters using a U-ditch concrete measuring 60x60 centimeters along 644 meters and a box culvert measuring 60 centimeters along 25 meters.

Then channel construction on Jalan Lewa RW 10 Pekayon Urban Village using a U-Ditch along 489 meters; channel on Jalan Sukapura Timur 6 Gg. Senggol RW 09 Cakung Barat using a U-Ditch measuring 40 centimeters and a box culvert measuring 80 centimeters.

Channel along 358 meters on Jalan Rorotan IX Gg. 4 Cakung Timur using a U-Ditch measuring 80 centimeters and a box culvert, as well as so forth.

His party also built a channel using the jacking method on Jalan Swadaya Raya, Pondok Ranggon Urban Village, Cipayung. Its length reaches 358.9 meters with a depth of 6.5 meters and is divided into two models.

Its construction used a U-Ditch measuring 80x80x120 centimeters with a length of 239.2 meters and a jacking channel with a length of 119.7 meters.

Of course, the work received appreciation from Unus, Chair of RT 06/02 Cilangkap Urban Village. He admitted that now his area is no longer flooded when heavy rain occurs after a water channel was built on Jalan Giri Kencana

"Thank you and appreciation to the East Jakarta Water Channel (SDA) Sub-agency for realizing this resident's proposal," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1033 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye901 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye540 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye444 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye377 personAldi Geri Lumban Tobing